Civil Engineering
2017-18
Replacement of the Chambly Canal Lock gates
1 090 000
Chambly, Québec
Architecture
2017
Foundations construction.
130 000$
Québec
Architecture
2017
Creation of an underground tunnel linking two buildings.
400 000$
Québec
Architecture
2017
Demolition and reconstruction of a parking ramp.
150 000$
Québec
Architecture
2017
Restoration of the Saint-Maurice church following the collapse of the facade. Concreting work in underpinning. Installation of anchors. Construction of a new forecourt. Various architectural works.
500 000$
Saint-Maurice
Civil Engineering
2017
Construction of a drinking water reservoir while maintaining an existing reservoir.
3 300 000$
Québec
Civil Engineering
2017
Excavation of the Plains of Abraham reservoir and installation of a waterproofing membrane. Repair of existing concrete. Installation of vents and hatches.
3 600 000$
Québec
Civil Engineering
2017
Rehabilitation of various concrete, sealing various basins, replacement of burettes and filter media, replacement of bypass valves and various structural corrections.
4 967 725$
Trois-Rivières
Civil Engineering
2017
Raising and repairing a bridge over Highway 20
735 000$
Rehaussement et réparation d’un pont au-dessus de l’autoroute 20.
Civil Engineering
2017
Removal of asbestos-containing rendering, various concrete repairs, surface rendering and installation of wire mesh on the bridge on Highway 281 above Highway 20.
1 006 245$
Saint-Michel-de-Bellechasse
Civil Engineering
2017
Partial demolition and reconstruction of a beam bridge in phase.
2 400 000$
Québec
Civil Engineering
2017
Temporary support for the bridge piers, repair of the P-14667N and P14667S bridge and bridge beams on Highway 40 in Trois-Rivières.
1 143 275 $
Trois-Rivières
Civil Engineering
2017
Demolition and complete reconstruction of the concrete slab.
675 425$
Lévis, Québec
Architecture
2016
Formwork and concreting slabs of the building.
1 000 000$
Québec
Civil Engineering
2016
Rehabilitation of the wooden wall on the right bank of Chambly Canal Lock 5
240 000$
Chambly, Québec
Civil Engineering
2016
The main works are the slab repair, exterior slab repairs, joint removal, diaphragm reconstruction and strike-protection walls, surface rendering, membrane and Three Bridge pavement on Highway 40 over Boulevard des Recollets and railway in Trois-Rivières.
3 872 435.00$
Trois-Rivières
Civil Engineering
2016
The work consists of various repairs to the deck, the replacement of support and sill blocks, and repairs to the deck drums over the Sainte-Anne River on Highway 40.
Sainte-Anne-de-la-Pérade
Civil Engineering
2016
Rehabilitation of an ancestral bridge.
1 100 000$
Montmagny
Civil Engineering
2016
Demolition and construction of a gantry crane bridge. Formwork and concreting of pavement concrete slabs.
2 300 000
Lévis
Civil Engineering
2016
Repair of certain foundation units and repositioning of bridge supports on Highway 138 over the Batiscan River
321 470$
Batiscan
Civil Engineering
2016
Removing the existing pavement, patching the slab, installing a concrete latex screed, membrane and paving the bridge on Highway 204 above Highway 20.
398 025$
Saint-Jean-Port-Joli
Various
2016
Formwork and concreting of the Côte de Sillery refurbishment project phase 3
1 080 000$
Québec
Various
2016
Demolition of an existing bridge. Construction of a new corten steel bridge on reinforced concrete abutment on piles. Landscaping and approved retaining wall.
1 700 000$
Gatineau
Architecture
2015
Removal of existing paving and installation of a membrane. Concrete repair
380 000$
Québec
Architecture
2015
Construction of a shelter for seals.
250 000$