Civil Engineering
2007
Demolition and construction of a gantry bridge. Realization of a path of deviation.
2 000 000$
St-Paul de Montminy
Various
2007
Landscaping at the Citadelle de Québec
200 000$
Québec
Civil Engineering
2007
Repair of the Quai de Portneuf.
300 000$
Portneuf
Civil Engineering
2006
Démolition et construction d’un pont précontraint à dalle épaisse. Réalisation d’une déviation du trafic.
5 000 000$
Québec
Various
2006
Construction of a bridge.
600 000$
Québec
Civil Engineering
2005
Construction of a drinking water reservoir
Clermont
Civil Engineering
2005
Construction of a 3500 m3 rainwater retention tank, including the service building and the water diversion chamber.
3 100 000$
Québec
Various
2005
Construction of a steel-wood bridge over the Duberger River.
100 000$
Québec
Various
2005
Construction of a suspended footbridge over the Duberger River. This project received an award of excellence from the Canadian Institute of Steel Construction ICCA-QUÉBEC in the JURY TOP STAMP category for “the delicacy of the gesture, the consistency of a skid-steerable steel footbridge.” whose suspended structure integrates melodiously into the linear park landscape “.
240 000$
Québec
Architecture
2003
Reconstruction of a new border crossing consisting of three buildings interconnected by canopies. The international building now includes customs and immigration activities. Inside we find on two levels; a reception desk, interview rooms, cells, administrative offices and a conference room. In 2004, the Armstrong Border Crossing received the CONTECH Award for Innovative Practice in Sustainable Development.
7 200 000$
Armstrong
Civil Engineering
2003
Construction of a rainwater retention tank with a capacity of 8000 m3, including the service building and the water diversion chamber.
4 100 000$
Québec
Civil Engineering
2003
Rehabilitation of the Beaudet Dam
1 000 000$
Victoriaville
Industrial
2003
Complex work of formwork and concreting of the foundations of the new MP4 paper machine, including the precise installation of nearly 3,000 anchors poured into the concrete. This work was done in just 8 months.
9 000 000$
Trois-Rivières
Civil Engineering
2002
Bridge beams reinforcement
1 500 000
St-Martin
Various
2002
Construction of three bridges 30 meters in length over the St. Charles River.
350 000$
Québec
Architecture
2001
Construction of a service tunnel
400 000$
Québec
Architecture
2001
Foundation construction for the filtration plant at the Aquarium de Québec.
1 000 000$
Québec
Various
2001
Construction of a swimming pool.
Québec
Civil Engineering
2000
Agandissement reservoir drinking water
2 300 000$
Saguenay
Industrial
1999
arious civil works including building foundations, a liquid pitch tank and a rolled and compacted concrete (BCR) pavement (Work since 1999).
1 500 000$
Alma
Industrial
1999
Various civil works including building foundations, a liquid pitch tank and a rolled and compacted concrete (BCR) pavement (Work since 1999).
1 500 000$
Alma
Industrial
1999
Various civil works including building foundations, a liquid pitch tank and a rolled and compacted concrete (BCR) pavement (Work since 1999).
1 500 000$
Alma
Architecture
1998
Expansion of the Casino de Charlevoix.
550 000$
La Malbaie
Architecture
1998
Expansion of the Richelieu Manor
300 000$
La Malbaie
Civil Engineering
1998
Construction of a new basin for wastewater treatment.
550 000$
Ste-Hyacinthe